Knowledge

Nov 26

‘Why can’t everyone have a good quality of life?’

Nov 26

Designing for dignity: how the LSA helped Dominic O’Dea find his voice

Oct 26

LSA Open Evening – 25 November 2026

Oct 26

The LSA launches a new Part 2 / Part 3 combined programme

Oct 26

Professor Sadie Morgan OBE: ‘Let’s bring a bit of joy back in our lives’

Oct 26

LSA alumnus wins at Built Environment Awards 2026

Oct 26

Job opportunity: Caretaker

Aug 26

Dezeen School Show: LSA MArch

Aug 26

LSA Part 0 leads shortlisted at the NLA Awards

Aug 26

The LSA Award 2026 Winner: Caspar Barker

Jul 26

LSA Student Highly Commended at Architects for Health Student Design Awards

Jul 26

LSA student named a finalist for the Test of Time Awards

Jul 26

Architectural Education as a Situated Practice and the Little Free Library

Jul 26

From Crisis to Opportunity: Reframing the Future for Architecture Graduates

Jun 26

Architectural Education as a Situated Practice | London Festival of Architecture

Jun 26

LSA Student shortlisted for the AJ New Talent Award

May 26

If Only We Will: Degree Show 2026

May 26

Belonging by Design: A Collective Act | London Festival of Architecture

May 26

Design Think Tank: Call for Practice Briefs

Apr 26

LSA International Field Trip 2026: Belgium

Apr 26

LSA Representation in the AJ Small Projects 2026 shortlist

Mar 26

LSA Student Placement with Ryder Architecture

Mar 26

Alumni Case Study: Elliott Wang

Feb 26

Open Evening 1 April 2026

Jan 26

Design For Life returns this February

Jan 26

Call for Abstracts: Learnings/Unlearnings Conference

Jan 26

Part 0 Lead wins at Inspire Future Generations Awards

Jan 26

Applications open for MArch in Designing Architecture

Jan 26

The University of the Built Environment appoints new Professors

Dec 25

Get to know Lee Ivett

Dec 25

Open Evening 20 January 2026

Dec 25

LSA faculty nominated for Inspire Future Generations Awards

Dec 25

Yang Yang Chen shortlisted for Young Talent award

Dec 25

LSA Part 0 co-leads shortlisted for Inspire Future Generations Awards

Dec 25

LSA tutor is RIBA House of the Year finalist

Nov 25

Lee Ivett Open Evening Speech

Nov 25

Hugh Strange Architects: House of the Year 2025 shortlist

Nov 25

Lee Ivett starts as Head of School

Oct 25

LSA tutor wins Young Architect of the Year 2025

Oct 25

Open Evening 19 November 2025

Oct 25

AJ Student Prize | Postgraduate Winner: Amy Wilkinson

Sep 25

Hugh Strange Architects Shortlisted for RIBA Stirling Prize 2025

Sep 25

‘Design for Life’ returns this November – Part 4

Aug 25

Lee Ivett appointed as Head of School at London School of Architecture

Aug 25

George Moldovan shortlisted for 2025 Structural Timber Awards

Jun 25

‘A Seat at the Table’ Summer Show 2025

Jun 25

University of the Built Environment

Jun 25

OPEN DAY 11 June 2025

May 25

Future Skills Think Tank

May 25

LSA and UCEM merge

Load more

Carrick Blore — Re:Source

Earth Peel Plastic Jester

Re:Source — A propositional research and development case study for the use of recycled plastic as a building material. By Carrick Blore.

 

Location

Bridgewater Road, Stratford, Newham, London

 

Objective

One hundred per cent of the project’s materials to be reused without loss of value.

 

Motivation

Building materials often end up as waste when no longer needed, destroying ecosystems, which leads to increased environmental costs, and the risk of resource scarcity. To create a sustainable future, the building sector needs to move towards a circular economy.

 

Strategy

The scheme’s proposed buildings function as banks of valuable materials, slowing down the usage of resources to a rate that meets the capacity of the planet. Through circular design chains, the buildings – which produce less waste and use less virgin resources – sustain their material value.

 

Impact

Re:Source seeks to lead the way in the building industry, playing a central role in reducing energy consumption and waste across the planet.

 

Re:Source_Recycled plastic landscape harmoniously blending into the on-site’ off-site factory’, workshop, educational and certification facilities

 

Poly-park playing and the Plastic Pleasure Gardens

Recycled plastic paths made by local school children leading users, visitors, and community around the landscape

Recycled plastic landscape and buildings becoming intrinsically part of the local context and community

A series of buildings almost completely hidden within a flowing landscape, a recycled plastic poly-park for the whole of London

A sectional cut-through showing the profile of the recycled plastic landscape seamlessly fusing into London’s silhouetted cityscape

Componentising recycled plastic building elements, with the aim to be able to make and build completely self sufficiently onsite

Recycled plastic landscape becomes completely accessible to everyone, yellow paths are only a suggestions of route choice around site

Recycled plastic structural facade components made on site becoming construction elements of the future phased buildings

 

Further work 

Contact details